Huaneng Jinghong Hydropower Station
2025-04-11
Project Name: Huaneng Jinghong Hydropower Station Spillway Face Erosion and Abrasion Treatment
Material Application: MB-EQ erosion and abrasion resistant epoxy mortar, LW water-soluble polyurethane grouting material
Treatment Result: During the construction of the Jinghong Power Plant spillway gate spillway face overhaul project, MB-EQ erosion and abrasion resistant epoxy mortar and LW water-soluble polyurethane grouting material developed by Hangzhou Meibu Material Technology Co., Ltd. were used to treat the corresponding parts of the project. The main construction parts are: spillway gate spillway face; the main construction scope includes: concrete surface grinding of hydraulic structures spillway gate surface, pothole repair, chemical grouting of spillway face cracks, coating of spillway gate spillway face with epoxy mortar, chemical grouting of structural joints, and suspended platform assembly and disassembly. After the treatment, the flow was achieved as scheduled. After the follow-up visit, the retention rate of MB-EQ erosion and abrasion resistant epoxy mortar was high, and the spillway face concrete was effectively protected.
Copyright © Hangzhou Every Step Materials Technology Co., Ltd.
Technical Support:China Enterprise PowerHangzhou|SEO