Service Cases
The company specializes in the research and development, sales, application, and technical services of engineering materials in the field of safety of engineering structures such as hydropower dams, high-speed railways, and subway tunnels.
Tuoba Hydropower Station
2025-05-09
Project Name: Tuoba Hydropower Station Stilling Basin and Spillway Erosion and Abrasion Protection
Materials Used: MB-EQ Anti-Erosion and Abrasion Epoxy Mortar, HK-UW-3 Anti-Erosion and Abrasion Epoxy Grout
Results: After completion of the Tuoba Hydropower Station stilling basin and spillway chute concrete project, before commissioning, MB-EQ anti-erosion and abrasion epoxy mortar and HK-UW-3 anti-erosion and abrasion epoxy grout were used for anti-erosion and abrasion protection. The treated area exceeds 20,000 square meters.
Copyright © Hangzhou Every Step Materials Technology Co., Ltd.
Technical Support:China Enterprise PowerHangzhou|SEO