Suzhou Metro Line 5
2025-05-12
Project Name: Suzhou Metro Line 5 Station Leakage Treatment
Materials Used: PE Chemical Grouting Material
Treatment Result: Before the commissioning of Suzhou Metro Line 5 station, some structural joints had leakage and required grouting treatment. After grouting treatment with PE chemical grouting material, the leakage problem was effectively solved, and the station successfully completed the commissioning acceptance.