Fengman Hydropower Station
2025-04-11
Project Name: Chemical Grouting Treatment of Structural Joints in Fengman Hydropower Plant Powerhouse
Materials Used: LW water-soluble polyurethane grouting material, HW water-soluble polyurethane grouting material
Treatment Results: After the Fengman Hydropower Station dam impounded water, leakage occurred in the structural joints of the powerhouse. LW and HW water-soluble polyurethane grouting materials were used for chemical grouting and waterproofing treatment. The leakage was effectively stopped after the treatment.